==Updates & Discussion== | ==Updates & Discussion== | ||
* Fabricate (2) 6mm Cu radiators | * Fabricate (2) 6mm Cu radiators | ||
+ | * Geant4 model for Greg | ||
* Detector specs/status | * Detector specs/status | ||
* Magnet design/scope | * Magnet design/scope |
Latest revision as of 15:14, 2 February 2022
First installation
- remove ~4' pipe in straight passthrough
- add reducer + ceramic break + bubble radiator
- add MIT bates magnet + Mott detector on the support table
- realistic time frame for DAQ
Second installation
- Replace MIT magnet with Lakshmi's magnet
- Replace Mott detector with Eric's detector
Updates & Discussion
- Fabricate (2) 6mm Cu radiators
- Geant4 model for Greg
- Detector specs/status
- Magnet design/scope