Difference between revisions of "Meeting 2/3/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
 
Line 11: Line 11:
 
==Updates & Discussion==
 
==Updates & Discussion==
 
* Fabricate (2) 6mm Cu radiators
 
* Fabricate (2) 6mm Cu radiators
 +
* Geant4 model for Greg
 
* Detector  specs/status
 
* Detector  specs/status
 
* Magnet design/scope
 
* Magnet design/scope

Latest revision as of 15:14, 2 February 2022

First installation

  • remove ~4' pipe in straight passthrough
  • add reducer + ceramic break + bubble radiator
  • add MIT bates magnet + Mott detector on the support table
  • realistic time frame for DAQ

Second installation

  • Replace MIT magnet with Lakshmi's magnet
  • Replace Mott detector with Eric's detector

Updates & Discussion

  • Fabricate (2) 6mm Cu radiators
  • Geant4 model for Greg
  • Detector specs/status
  • Magnet design/scope