Difference between revisions of "Meeting 2/10/22 - COMTRA"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
==Geant4 model discussion== | ==Geant4 model discussion== | ||
− | * | + | * Eric/Greg |
==Second installation== | ==Second installation== |
Latest revision as of 08:57, 10 February 2022
First installation
- Radiator + ceramic in TL-1137, MIT polarized target + detector removed, survey then to TL https://logbooks.jlab.org/entry/3984465
- ME layout
DAQ system discussion
- Bryan/Chris
Geant4 model discussion
- Eric/Greg
Second installation
- Fabricate (2) 6mm Cu radiators
- Detector specs/status
- Magnet design/scope