Difference between revisions of "PPB - December 14, 2022"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" [[media:abstract-1313.pdf]] | ** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" [[media:abstract-1313.pdf]] | ||
** R. Kazimi et al., "Electron Injector for Positron Option at CEBAF" | ** R. Kazimi et al., "Electron Injector for Positron Option at CEBAF" | ||
− | ** A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" | + | ** A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]] |
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun" | ** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun" | ||
[[media:abstract-1794.pdf]] | [[media:abstract-1794.pdf]] |
Revision as of 17:29, 12 December 2022
Coordinates
- On-site => Wednesdays @ 11am EDT in TL-2236
- Zoom => https://jlab-org.zoomgov.com/j/1609550529?pwd=RlNJYytUSk1tbzNJeUIxNUptTk9UzQT09&from=addon
Agenda
- Update on submission to US-Japan DOE HEP Cooperative FOA
- On track to submit 12/14 (one day early)
- Funding would begin August 2023 and last for 3 years media:US-Japan-Topics.pptx
- IPAC'23
- Update on abstracts submitted to IPAC'23 related to to e-/e+ R&D at LERF
- J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
- R. Kazimi et al., "Electron Injector for Positron Option at CEBAF"
- A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
- G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun"
- Today's speaker
- Sunil Pokharel, ODU grad student "title"