Difference between revisions of "PPB - April 12, 2023"

From Ciswikidb
Jump to navigation Jump to search
Line 6: Line 6:
 
* IPAC'23 - Joe, Amy, Reza, Eric - Which day is your poster?  Plan to circulate poster and proceedings?
 
* IPAC'23 - Joe, Amy, Reza, Eric - Which day is your poster?  Plan to circulate poster and proceedings?
 
* Max - Status of PEPPo-II LDRD proposal
 
* Max - Status of PEPPo-II LDRD proposal
 +
** Andriy's simulations
 +
*** max e+ yield 6e-4 at 1 mm thickness
 +
*** emittance cuts do not change this very much despite increase in beam size
 +
*** deposited power favors thinner targets (but thermal conductivity may not?)
 +
** Chicane layout and integration into existing space
 +
*** after 0L02, make use of existing DP can, fast valve, at least 2 quads
 +
*** could start at 5D line, gives us BCM and third quad for free, but perhaps not enough space
 +
*** to use existing viewer, harp, quads, and FC2: reinject before ITV0L03?
 +
*** TODO: drawing, tally of components
 
* Status from target working group
 
* Status from target working group
 
* Bob - status of SRF toy model
 
* Bob - status of SRF toy model

Revision as of 15:35, 11 April 2023

Meeting Coordinates

Agenda

  • IPAC'23 - Joe, Amy, Reza, Eric - Which day is your poster? Plan to circulate poster and proceedings?
  • Max - Status of PEPPo-II LDRD proposal
    • Andriy's simulations
      • max e+ yield 6e-4 at 1 mm thickness
      • emittance cuts do not change this very much despite increase in beam size
      • deposited power favors thinner targets (but thermal conductivity may not?)
    • Chicane layout and integration into existing space
      • after 0L02, make use of existing DP can, fast valve, at least 2 quads
      • could start at 5D line, gives us BCM and third quad for free, but perhaps not enough space
      • to use existing viewer, harp, quads, and FC2: reinject before ITV0L03?
      • TODO: drawing, tally of components
  • Status from target working group
  • Bob - status of SRF toy model
  • Any other business...

Upcoming

  • April 19 - Joint meeting with PWG
  • May 7-13 - IPAC'23 (Joe, Amy, Reza, Eric)
  • May 15-19 - LCWS (Andriy, Carlos)