Difference between revisions of "PPB - April 12, 2023"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
* IPAC'23 - Joe, Amy, Reza, Eric - Which day is your poster? Plan to circulate poster and proceedings? | * IPAC'23 - Joe, Amy, Reza, Eric - Which day is your poster? Plan to circulate poster and proceedings? | ||
* Max - Status of PEPPo-II LDRD proposal | * Max - Status of PEPPo-II LDRD proposal | ||
+ | ** Andriy's simulations | ||
+ | *** max e+ yield 6e-4 at 1 mm thickness | ||
+ | *** emittance cuts do not change this very much despite increase in beam size | ||
+ | *** deposited power favors thinner targets (but thermal conductivity may not?) | ||
+ | ** Chicane layout and integration into existing space | ||
+ | *** after 0L02, make use of existing DP can, fast valve, at least 2 quads | ||
+ | *** could start at 5D line, gives us BCM and third quad for free, but perhaps not enough space | ||
+ | *** to use existing viewer, harp, quads, and FC2: reinject before ITV0L03? | ||
+ | *** TODO: drawing, tally of components | ||
* Status from target working group | * Status from target working group | ||
* Bob - status of SRF toy model | * Bob - status of SRF toy model |
Revision as of 15:35, 11 April 2023
Meeting Coordinates
- On-site => Wednesdays @ 11am EDT in TL-2236
- Zoom => https://jlab-org.zoomgov.com/j/1616149761?pwd=SDJKY3NhWEtBOUR5MVR5RlY1R1pHdz09&from=addon
Agenda
- IPAC'23 - Joe, Amy, Reza, Eric - Which day is your poster? Plan to circulate poster and proceedings?
- Max - Status of PEPPo-II LDRD proposal
- Andriy's simulations
- max e+ yield 6e-4 at 1 mm thickness
- emittance cuts do not change this very much despite increase in beam size
- deposited power favors thinner targets (but thermal conductivity may not?)
- Chicane layout and integration into existing space
- after 0L02, make use of existing DP can, fast valve, at least 2 quads
- could start at 5D line, gives us BCM and third quad for free, but perhaps not enough space
- to use existing viewer, harp, quads, and FC2: reinject before ITV0L03?
- TODO: drawing, tally of components
- Andriy's simulations
- Status from target working group
- Bob - status of SRF toy model
- Any other business...
Upcoming
- April 19 - Joint meeting with PWG
- May 7-13 - IPAC'23 (Joe, Amy, Reza, Eric)
- May 15-19 - LCWS (Andriy, Carlos)