Difference between revisions of "MOLLER PQB Meeting December 11, 2024"

From Ciswikidb
Jump to navigation Jump to search
Line 10: Line 10:
  
 
* '''Injector Beam Studies:'''
 
* '''Injector Beam Studies:'''
# Parasitic Checkout to 1D: Saturday December 14th Day and Swing shifts
+
# Parasitic Parity DAQ Checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 uA is scheduled.
# MOLLER tests and training to 1D: Sunday December 15th Day and Swing shifts
+
# MOLLER DAQ tests to 1D at 65 uA : Sunday December 15th Day and Swing shifts. A this time, MOLLER can change beam current, Helicity Board settings, etc.
 
 
  
 
* '''MOLLER Beam Studies:''' Wien Flip Table — [[media:PQB_Wien_plans.xlsx]]
 
* '''MOLLER Beam Studies:''' Wien Flip Table — [[media:PQB_Wien_plans.xlsx]]

Revision as of 17:37, 11 December 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • Injector Beam Studies:
  1. Parasitic Parity DAQ Checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 uA is scheduled.
  2. MOLLER DAQ tests to 1D at 65 uA : Sunday December 15th Day and Swing shifts. A this time, MOLLER can change beam current, Helicity Board settings, etc.