Difference between revisions of "MOLLER PQB Meeting December 11, 2024"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
* '''Injector Beam Studies:''' | * '''Injector Beam Studies:''' | ||
− | # Parasitic Parity DAQ | + | # Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled. |
# MOLLER DAQ tests to 1D at 65 µA : Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc. | # MOLLER DAQ tests to 1D at 65 µA : Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc. | ||
Revision as of 17:40, 11 December 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- Injector Beam Studies:
- Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
- MOLLER DAQ tests to 1D at 65 µA : Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.
- MOLLER Beam Studies: Wien Flip Table — media:PQB_Wien_plans.xlsx
- Fast Feedback Plans: first draft — media:FastFeedback_Plans.pdf