Mott Run 2 is scheduled from October 23 - 26.
 
Mott Run 2 is scheduled from October 23 - 26.
 +
 +
== [[Run 2 Plan]]
  
 
== [[Mott Run 2 Journal]] - Our online summary of the experiment with many useful links ==
 
== [[Mott Run 2 Journal]] - Our online summary of the experiment with many useful links ==
 
 
= Run II Priorities ? =
 
# Good knowledge of beam (energy, energy spread, emittance)
 
# Target thickness extrapolation at KE=5.0 MeV
 
# Sensitivity of analyzing power vs. energy about 5.0 MeV
 
# Repeat spot size and possibly energy spread systematic at KE=5.0 MeV
 
# Asymmetry vs. beam intensity
 
 
== Prep and HCO w/o beam ==
 
# (John) 31 MHz laser -
 
# (Riad) Test laser RF trigger at DAQ
 
# (Joe) Make a photocathode – SL5247-4 (52471-1 was used for Run I, but it's being removed from Gun2 next week)
 
# (Marcy) Check Mott vacuum, configuration (hipot 3D01 again?)
 
# (Joe) Cycle target ladder, test camera, test magnets, test 2D harp
 
# (Riad/Daniel) Check HV, check DAQ, Analysis, Macros ready for 31 MHz
 
 
== Pre-Run II Beam Setup and Tests  ==
 
# (Injector Group) Recovery to FC2 @ 6.3 MeV by 10/15
 
# (1 shift) Mott beam test - Test 31 MHz synchronization, set L/R/U/D delays, set PMT HV, check PMT response
 
# (1 shift) Beam diagnostics - Test harp, BCM calibration, quick emittance method
 
 
== Run II Beam and Polarimeter Setup ==
 
# Set KE=5.0 MeV
 
# Measure emittance at MQJ0L02
 
# Measure energy spread at IHA2D00
 
# Verify BCM calibration good
 
# Calibrate PITA IHWP=in/out
 
# Setup beam to Mott, check PMT HV, TOF spectra, set thresholds HI, check instrumental asymmetry
 
# Setup spin direction, use Mott for final adjustment
 
 
== Target Foil Extrapolation at KE=5.0 MeV ==
 
# Measure foils with large aperture
 
# Interleave 1um gold foils to demonstrate stabiilty
 
  
 
[[Availability]]
 
[[Availability]]

Revision as of 06:21, 7 October 2015

CEBAF_MeV_Mott_Polarimeter

Mott Run 2 is scheduled from October 23 - 26.

== Run 2 Plan

Mott Run 2 Journal - Our online summary of the experiment with many useful links

Availability

Mott Run 2 Motivation Discussion