Difference between revisions of "PQB Meeting June 9, 2016"

From Ciswikidb
Jump to navigation Jump to search
Line 20: Line 20:
 
'''Notes from this meeting:'''
 
'''Notes from this meeting:'''
  
* Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, PC x and y stages scan, and laser phase scan on Chopper.
+
* Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, Pockels Cell x and y stages scan, and laser phase scan on Chopper.
  
 
* Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?
 
* Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?

Revision as of 07:58, 13 June 2016

We will meet in TL 2236 Thursday June 9 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Plans for PQB beam tests in June

2- Halo Monitor plans in Hall A




Notes from this meeting:

  • Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, Pockels Cell x and y stages scan, and laser phase scan on Chopper.
  • Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?


Wien screen.jpeg