GTS meeting 8 26 19

From Ciswikidb
Revision as of 08:59, 26 August 2019 by Suleiman (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Update:
    • Replaced thermionic cathode
    • Added leak valve on mini-flange
    • Started Kr processing


  • Talking Points:
    • Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)