Document-Controlled Procedures and Assessments for UITF

From Ciswikidb
Revision as of 12:14, 4 March 2020 by Poelker (talk | contribs)
Jump to navigation Jump to search

OSPs, TOSPs and LOSPs for UITF

these procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

Transferring (loading/removing) targets to/from the HDice IBC in cave-2 of the UITF, valid through 3/11/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94834

HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104

UITF Cave2 ceiling roof tile removal, valid through 7/2/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=87551

Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380

UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility, valid through 2/20/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82655

UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424

keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/9/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82217

Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found in Docushare, could be useful someday): media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx, media:THA for Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx

UITF Laser Systems LOSP, valid through 1/24/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=97400


Other official documents managed via document-control, e.g., official assessments

UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 File:UITF sweep procedure SSG-PR-03-101 Rev. 20.0 January 3, 2020.pdf

Shielding Design Package from Vashek, approved by SCMB: https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, Photos of trench foam and lead shielding media:UITF trench shielding with photos.xls

UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)

UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx

UITF Final Approved ODH Assessment: File:UITF ODH Assessment.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit

UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf