Meeting Info
We will meet on Wed (UAS 8am, JLab 10am, IJCLab 4pm)
Bluejeans: https://bluejeans.com/405130883/4307
Code to start the meeting 4307
Oct 8 Agenda
- Round table updates
- Linux GPT-s complete need to install and check before putting on the farm
- Unpolarized update- Mark
- Eric- Last 3 slides relevant to two target system media:4SHAS.pptx
- Sami- Two target simulation media:Thickness optimization (2).pptx
- optimization run time 24-48 hrs
Objective(s)
- Mark: produce table for unpolarized simulation results
- Mark: 500M simulation from GEANT4 in polarized beamline
- Mark: python/Matlab GPT Plots
- Mark: Verify Linux GPT -s functions
Meeting Notes & Objectives Status
- addition of collimation in Sami's simulation.
- scheme to improve efficiency of distribution and statistics.
- 123 MeV not enough energy for two target system.
- begin thinking about 10 GeV concept in the tunnel media:10GeV.png