Meeting 2/3/22 - COMTRA
Jump to navigation
Jump to search
First installation
- remove ~4' pipe in straight passthrough
- add reducer + ceramic break + bubble radiator
- add MIT bates magnet + Mott detector on the support table
- realistic time frame for DAQ
Second installation
- Replace MIT magnet with Lakshmi's magnet
- Replace Mott detector with Eric's detector
Updates & Discussion
- Fabricate (2) 6mm Cu radiators
- Detector specs/status
- Magnet design/scope