GTS meeting 6 18 18
Jump to navigation
Jump to search
- GTS updated plan
- Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater ):
- 30 minutes Sb deposition
- 60 minutes Sb deposition
- 90 minutes Sb deposition
- CST microwave studio simulations of 300 kV GTS gun