GTS meeting 1 28 19

From Ciswikidb
Revision as of 09:27, 28 January 2019 by Suleiman (talk | contribs)
Jump to navigation Jump to search

Draft Drawings of T-Gun and 3D Views

media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY_REV_A.pdf
media:JL0067948_28Jan2019_VIEW1.JPG
media:JL0067948_28Jan2019_VIEW2.JPG
media:JL0067948_28Jan2019_VIEW3.JPG
media:JL0067948_28Jan2019_VIEW4.JPG
media:JL0067948_28Jan2019_VIEW5.JPG


List of beamline hardware modifications

  1. Replace YAG screen on Viewer 1 - Done
  2. Replace Slit on Viewer 2 with holes assembly - Done
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can - Done
  6. Remove Faraday Cup - Done
  7. Remove bellow upstream of dump - Done
  8. Remove LDR Harp arm and replace with ion-pump
  9. Install TE011 Cavity
  10. Install Deflecting Cavity - Done
  11. Install new 5th solenoid
  12. Move DP can 1 to end of beamline - Done
  13. All bellows at least 2.5 inch diameter - Done
  14. Both gate valves are 2.5 inch-bore and will remain on beamline - Done


List of hardware support

  1. Install Deflecting Cavity power supply, MO and other parts
  2. Install TE011 Cavity readout cable and electronics


List of software and controls changes

  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen


Remove gain-switched laser from GTS to Lab 6

Install Brock's Magnetometer Cavity

Modification to HV and Preparation chambers

  1. Upgrade anode HV bias feed-through to 5 kV
  2. Remove anode and clean melted spot
  3. Fix Transverse Manipulator
  4. Fix Sb boat
  5. Clean Sb pellets off chamber


Install BNL high bunch laser