GTS meeting 9 30 19
Jump to navigation
Jump to search
(1) Get GTS back to operational
To Fix List (to get GTS running):
- Glassman PSS Chassis (Service request to Omar - Carlos)
- LCW Chassis (Sarin/ Mike Todd - follow up)
- Turbo (Replacement part for display - Bubba/Fay)
- Spellman (Augistine/ Riad)
- Picoammeter x2? (Pete Francis in hand - sent for fix)
To Check:
- Viewers (Operation - and cameras) (Viewer software - contact Brian Freeman)(??IOC reset?? Tony Delacruz)
- Magnets (IOC check)
- Harp (electronics)
- Cavities (electronics)
- Cathode solenoid - power supply
(2) T-Gun Upgrades
Need a safe gun - no devastating trips. Limit voltage to 135kV
RF cage - Features:
- HV attaches through the back as designed.
- G10 plate to support the HV cable
- Nitrogen flow, also through G10 plate aimed at the back of the hot deck
- Nitrogen flow, though the top of the cage, aimed at ceramic
- Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown)
To Fix/Modify:
- DC bias supply - set point fix (John Musson)
- RF Cage (Mark/Fay)
- Back plate to allow increased cooling (open the hole)
- Move Xelera spellman to the GTS vault
- Software issues (contact Spellman again)
- Install new fiber link & check
(3)
Housekeeping:
- Remove RXX cables from GTS
- Remove JLab spellman
- Sort out the air and nitrogen lines.
- Buy a shop vac (ask Bubba)