200KV gun BPM's

From Ciswikidb
Revision as of 12:14, 27 August 2020 by Grames (talk | contribs)
Jump to navigation Jump to search

New BPM's were developed for the 200 kV gun NEG tube beam line.

Please see Region 1 released drawings for prints.

Performance Notes
  • BPM #1
  • BPM #2
  • BPM #3
  • BPM #4
Design and draft notes
Assembly sequence
  • Receive can/feedthroughs
  • Clean
  • Degas
  • NEG Coat
  • Check feedthroughs
  • Assemble feedthroughs
  • serialize
  • Leak check cans
  • electrical measurement
  • report K's and center