Bubble Demo ME May 9, 2014
Jump to navigation
Jump to search
We will meet Friday May 9 @ 9am in TL-2236.
SUMMER Installation
DL Items
- (Shaun/Joe) Are DL drawings signed off?
- (Tim/Joe) Identify vendor for DL?
- (Tim/Joe/Shaun) Identify vendor for DL alignment plate?
Beamline layout
- (Joe/Shaun) Part list
- re-use from tunnel
- on shelf
- buy part
- design/fab part
- (Shaun) Bellows arrangement
- (Shaun) Modify support of "green" girder
- (Shaun) Plan/schedule for drawings and fabrication
- (Riad) Aluminum photon dump dimensions
Beamline components
- (Joe) Are MBH corrector strengths sufficient?
- (Joe M.) Is radiator cooling flange sufficient?
Bubble Chamber Alignment
- (Riad/Brad/Shaun) Mounting in tunnel
- (Riad/Brad/Shaun) Chamber alignment capability
FINAL installation
- Identify suitable dump dipole and its dimensions