2021-05-26

From Ciswikidb
Jump to navigation Jump to search

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Long Term Schedule: Gantt (Outstanding tasks)

  1. Supplementary Shielding Installation: Mid-June
  2. Beamline Commissioning / Test Plans / Shielding Verification
  3. 7/26/21 Start Hot Check-out
  4. Commission new beam line and execute experiment
  5. Science!!!

New items for discussion:

Short term schedule update:
This week:

  • Area up to transition after solenoid under vacuum. RGA leak check completed.
  • Downstream viewer / faraday cup assembly under vacuum. RGA leak check completed.
  • Last 4 5/8" bpm pulled from elevated line & installed. (One: failed insertion measurements & w/ John Musson, One: stripped tap hole).
  • Spool pieces installed on both sides of 1st cross (one last one remaining); all but ~2 feet of beam line now under vacuum and leak checked.
  • Vacuum falling, but light bake may be required once we have completed installation.
  • Roof tiles off for HDIce (5/24), Dilution refrigerator craned out (5/25), and then roof tiles replaced again (5/26).


  • Gun work progressing well:
    1. HV chamber evaluation - plan to bake to evaporate lubricant & pump it off, install photocathode, and bake again.
    2. Gun rebuild schedule
    3. Minor SF6 leak in HV chamber identified; repair later...


Next Week:

  • Mount bottle rack in Labyrinth; remove gas bottles to rack.
  • Wastewater experiment line fully under vacuum (with flange in place of the thin window).
  • Install target mechanism
  • Build 80/20 support structure; Pb table components awaiting delivery.
  • Unistrut mounting for cables - Neal will do when available
  • Break vacuum in FC3 region
  • Ready to install Al base plates for FC3 region rework as well as solenoid stand. FC3 plate awaiting machining.
  • Last spool piece [4.5" flange x 24.5" long x 4 5/8" flange] under fabrication. To install:
    1. Ion pumps OFF
    2. Purge with GN2 from both sides, one side through pump cart, the other side through kwik flange with 1/4" compression port.
    3. Use other pump cart from vacuum lab TL1137 (attached to the LIGO tube station) to vent from both sides, with GN2. Wait until Matt's return if desired.
    4. One more pump down and RGA leak check
    5. Add the thin window
    6. Heat / bake beam line
    7. Activate NEGs
    8. Move ion pumps onto house power / UHV supplies.

(Note: Pump cart w/ RGA suffering intermittent leak; Matt isolated to 11 L/s pump & 4-way cross joint - 4-way cross new, so swap out 11 L/s pump if it's an issue. One is staged on shelf in cave.)


2 weeks:

  • Add Mu metal over bellows on wastewater line.
  • Switch Wastewater line Vacuum HV from local supplies to house power. Make UED updates as appropriate for vacuum system.
  • Pull Heliax from Spectrum analyzer/Control room >> Buncher
  • 4th terminal system in Control room under assembly/rebuild
  • Items from To-do list...

Engineering Other business

Reports on Open Action Items:

Action Items:

  • Formal run plan (McCaughan)

Back to Main Meeting Minutes Page