Talk:GTS meeting 4 5 16

From Ciswikidb
Revision as of 13:45, 5 April 2016 by Chgarcia (talk | contribs) (Created page with "* To protect the viewer crystal from beam damage: ** Ask Omar: ** To look at the GTS drive laser control chassis for DL trigger ** Is there a line-sync module? it is a logic l...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • To protect the viewer crystal from beam damage:
    • Ask Omar:
    • To look at the GTS drive laser control chassis for DL trigger
    • Is there a line-sync module? it is a logic level to trigger things
  • Magnet nomenclature