Talk:GTS meeting 4 5 16
Jump to navigation
Jump to search
- To protect the viewer crystal from beam damage:
- Ask Omar:
- To look at the GTS drive laser control chassis for DL trigger
- Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc.
- Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room.
- Magnet nomenclature