GTS meeting 6 20 16

From Ciswikidb
Revision as of 13:32, 21 June 2016 by Chgarcia (talk | contribs) (Created page with "* [https://logbooks.jlab.org/entry/3410840 1 mA to the dump! at 275 kV] ** The QE was estimated to be around 0.3% ** We discovered that the Haimson coil corrector was not stee...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • 1 mA to the dump! at 275 kV
    • The QE was estimated to be around 0.3%
    • We discovered that the Haimson coil corrector was not steering the beam properly. Later on Joe Grames and Yan Wang discovered it was wired up as a quad. They corrected the problem.
  • Beam on Viewers
    • Adriana and Shukui did a calibration of the laser power meter located inside the hutch and read in the control room with respect to the laser power going into the gun vacuum chamber.
  • Did the cathode got damaged here?
  • Image of cathode damage
  • Laser and electron beam after discovering bad laser shape
    • Adriana discovered that the bad laser shape is due to a damaged polarizer in the hutch. Shukui gave permission to fix the problem.
  • The graph below shows the QE curves for various runs, indicating QE drop with running time.