Gallery of new files
Jump to navigation
Jump to search
This special page shows the last uploaded files.
- Our 400kV gun R&D plan for Joe KEK visit to JLab Feb 25 2019.pptx Chgarcia
16:09, 20 February 2019
; 25.68 MB
- Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf Poelker
12:36, 20 February 2019
; 389 KB
- Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf Poelker
12:36, 20 February 2019
; 2.39 MB
- THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf Poelker
12:06, 13 February 2019
; 521 KB
- OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx Poelker
12:05, 13 February 2019
; 23.07 MB
- OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf Poelker
12:05, 13 February 2019
; 2.59 MB
- Haysg JL0067948-MAGNETIZED BEAM THERMIONIC GUN ASSY 12Feb2019.pdf Suleiman
16:02, 12 February 2019
; 3.5 MB
- OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf Poelker
16:36, 11 February 2019
; 4.08 MB