All public logs
Jump to navigation
Jump to search
Combined display of all available logs of Ciswikidb. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 15:01, 30 September 2021 Poelker talk contribs uploaded File:Thoughts on how to spend the next month with LHe at UITF beam studies.docx
- 15:00, 30 September 2021 Poelker talk contribs uploaded File:Thoughts on how to spend the next month with LHe UITF beam studies.docx
- 10:09, 30 September 2021 Poelker talk contribs uploaded File:Chopper to booster August 30, 2021.pdf
- 08:45, 7 September 2021 Poelker talk contribs uploaded File:Low carbon steel vacuum study project.pptx
- 15:12, 27 August 2021 Poelker talk contribs uploaded File:Chopper to booster 27July21.pdf
- 15:09, 27 August 2021 Poelker talk contribs uploaded File:Chopper to booster region buncher closer to booster 8 27 21 prelim design.pdf
- 06:55, 25 August 2021 Poelker talk contribs uploaded File:UITF quick reference rev.13.pdf
- 15:52, 23 August 2021 Poelker talk contribs uploaded File:CEBAF Accelerator Achievements.pdf
- 13:55, 20 July 2021 Poelker talk contribs uploaded File:FCup4 shielding.pdf
- 13:54, 20 July 2021 Poelker talk contribs uploaded File:FCup3 shielding.pdf
- 09:11, 20 July 2021 Poelker talk contribs uploaded File:Xi's list of elements through the water irradiation beamline.xls
- 11:54, 13 July 2021 Poelker talk contribs uploaded File:Updated to include water irradiation line and removal of elevated line.xls
- 09:56, 7 July 2021 Poelker talk contribs uploaded File:To do list at UITF for water irradiation studies 7 7 21.docx
- 08:44, 8 June 2021 Poelker talk contribs uploaded File:UITF status report memo to Lab Leadership June 2021.pdf
- 11:16, 3 June 2021 Poelker talk contribs uploaded File:The "s" positions of HDIce beamline.xls
- 10:54, 2 June 2021 Poelker talk contribs uploaded File:Xi's assessment of viewer alignment at UITF.pdf
- 14:46, 29 April 2021 Poelker talk contribs uploaded File:Sunil Pokharel presentation 200 keV beam into Grigory's quarter CM with Nb3Sn coated cavities.pdf
- 11:44, 29 April 2021 Poelker talk contribs uploaded File:Parts list old and new phase2 beamline.xls
- 10:50, 27 April 2021 Poelker talk contribs uploaded File:Chopper to booster 27April21.pdf
- 11:30, 22 April 2021 Poelker talk contribs uploaded File:Phase2 beamline 4 22 21.png
- 14:12, 14 April 2021 Poelker talk contribs uploaded File:ESource KOM presentation ILC inverted gun.pptx
- 14:08, 14 April 2021 Poelker talk contribs uploaded File:JLab ILC inverted gun status.pptx
- 14:05, 14 April 2021 Poelker talk contribs uploaded a new version of File:ILC 200kV Inverted Gun.pptx
- 14:03, 14 April 2021 Poelker talk contribs uploaded File:R&D status ILC 200 kV inverted gun.pptx
- 13:55, 14 April 2021 Poelker talk contribs uploaded File:ILC 200kV Inverted Gun.pptx
- 13:51, 14 April 2021 Poelker talk contribs uploaded File:JLab ILC gun Nomura Research Institute visit.pptx
- 13:47, 12 April 2021 Poelker talk contribs uploaded File:Haipeng booster IPAC2015.pdf
- 13:47, 12 April 2021 Poelker talk contribs uploaded File:Haipeng booster IPAC2013.pdf
- 13:44, 12 April 2021 Poelker talk contribs uploaded File:Yan's summary of booster studies to date.pptx
- 13:41, 12 April 2021 Poelker talk contribs uploaded File:Reza's booster requirements.docx
- 13:30, 12 April 2021 Poelker talk contribs uploaded File:Haipeng's ppt slides with booster design features.docx
- 13:26, 12 April 2021 Poelker talk contribs uploaded File:Max's RF power measurements related to nonlinear behavior of 2-cell GSet.pdf
- 10:57, 23 March 2021 Poelker talk contribs uploaded File:HDIce run2b summary preliminary report.pdf
- 10:19, 19 March 2021 Poelker talk contribs uploaded File:Jonathan Creel's slides on CTF upgrade plans.pdf
- 13:30, 17 March 2021 Poelker talk contribs uploaded File:Neil's old spreadsheet of installation group tasks associated with booster installation.xls
- 12:27, 17 March 2021 Poelker talk contribs uploaded File:Neil's spreadsheet of installation group tasks associated with booster installation.xls
- 15:43, 11 March 2021 Poelker talk contribs uploaded File:Updated HDIce Run4 plan i.e., what we actually did.pdf
- 16:22, 6 March 2021 Poelker talk contribs uploaded File:Booster interior with dimensions2.pdf
- 15:45, 6 March 2021 Poelker talk contribs uploaded File:Booster interior with dimensions.jpg
- 15:44, 6 March 2021 Poelker talk contribs uploaded File:CAD drawing booster exterior.pdf
- 15:37, 6 March 2021 Poelker talk contribs uploaded File:Booster interior image.jpg
- 15:35, 6 March 2021 Poelker talk contribs uploaded File:SRF commissioning results at UITF no beam.pptx
- 15:34, 6 March 2021 Poelker talk contribs uploaded File:SRF commissioning results of 7-cell.xls
- 15:34, 6 March 2021 Poelker talk contribs uploaded File:SRF commissioning results of 2-cell.xls
- 15:32, 6 March 2021 Poelker talk contribs uploaded File:SRF booster commissioning results summary.xls
- 15:32, 6 March 2021 Poelker talk contribs uploaded File:Haipeng's mathcad description of booster.pdf
- 15:31, 6 March 2021 Poelker talk contribs uploaded File:Haipeng's ppt presentation on booster.pptx
- 18:38, 3 March 2021 Poelker talk contribs uploaded File:HDIce Run4 plan.pdf
- 13:17, 25 February 2021 Poelker talk contribs uploaded File:The sense circuit for 15 degree dipole magnet that provides gun HV permission.docx
- 16:14, 22 February 2021 Poelker talk contribs uploaded File:UITF ODH Assessment revision2.pdf