User contributions
Jump to navigation
Jump to search
- 11:57, 15 April 2024 diff hist -41 Apr 17 2024
- 11:54, 15 April 2024 diff hist +77 Apr 17 2024
- 09:29, 15 April 2024 diff hist 0 Apr 17 2024
- 09:28, 15 April 2024 diff hist +154 Apr 17 2024
- 09:28, 15 April 2024 diff hist 0 N File:Haysg SKETCH -JL0091130-0100-SECTION 01-PHOTO-GUN TO VBV2102.pdf current
- 08:58, 15 April 2024 diff hist +13 Apr 17 2024
- 08:57, 15 April 2024 diff hist +99 Apr 17 2024
- 08:57, 15 April 2024 diff hist 0 N File:R30-4 gun elecctrode front end pieces after barrel polishing iso view.jpg current
- 08:56, 15 April 2024 diff hist +113 Apr 17 2024
- 08:55, 15 April 2024 diff hist 0 N File:R30-4 gun elecctrode front end pieces after barrel polishing top view.jpg current
- 08:53, 15 April 2024 diff hist +122 Apr 17 2024
- 08:52, 15 April 2024 diff hist -13 Apr 10 2024 →== current
- 08:51, 15 April 2024 diff hist +748 N Apr 17 2024 Created page with "==Updates== * The electrode front end pieces 16-30 deg and 16-60 deg, two pieces each manufactured from 316 VAR SS have been polished in the SRF tumbler, UHV cleaned in the C..."
- 08:50, 15 April 2024 diff hist -1 Apr 10 2024 →Schedule
- 08:46, 15 April 2024 diff hist -16 Apr 10 2024 →Updates
- 08:37, 15 April 2024 diff hist +69 200 kV Polarized Gun →R30-4 200 kV Gun SAD 2024 Planning Meetings
- 14:52, 9 April 2024 diff hist +3 Apr 10 2024
- 14:52, 9 April 2024 diff hist +747 Apr 10 2024
- 14:50, 9 April 2024 diff hist 0 N File:Sample cathode front end 16-30 after corncob next to actual 16-60 after machine shop fab + polish with lathe iso view.jpg current
- 14:48, 9 April 2024 diff hist 0 N File:Sample cathode front end 16-30 after corncob next to actual 16-60 after machine shop fab + polish with lathe top view.jpg current
- 14:40, 9 April 2024 diff hist +1,187 Apr 10 2024
- 14:28, 9 April 2024 diff hist +1,558 N Apr 10 2024 Created page with "==Updates== * Marcy and Carlos are updating the schedule for removing the solenoid NEG tube, adding a viewport with pump out port to the upstream of the gun valve with the go..."
- 14:25, 9 April 2024 diff hist +69 200 kV Polarized Gun →R30-4 200 kV Gun SAD 2024 Planning Meetings
- 07:56, 3 April 2024 diff hist +73 Apr 03 2024 →Resources needed current
- 07:43, 3 April 2024 diff hist +265 Apr 03 2024 →Resources needed
- 07:36, 3 April 2024 diff hist +711 Apr 03 2024 →Updates
- 12:44, 2 April 2024 diff hist +512 N Apr 03 2024 Created page with "==Updates== * Fabrication ** Received two more cathode front end 16/30 samples from machine shop. These samples will be polished using sandpaper to remove machining marks fro..."
- 12:41, 2 April 2024 diff hist +69 200 kV Polarized Gun →R30-4 200 kV Gun SAD 2024 Planning Meetings
- 16:10, 26 March 2024 diff hist +68 Mar 27 2024 current
- 16:08, 26 March 2024 diff hist +1 Mar 27 2024
- 16:07, 26 March 2024 diff hist -45 Mar 27 2024
- 16:07, 26 March 2024 diff hist -9 Mar 27 2024
- 16:06, 26 March 2024 diff hist +16 Mar 27 2024 →Updates
- 16:06, 26 March 2024 diff hist +393 Mar 27 2024
- 16:06, 26 March 2024 diff hist 0 N File:Preliminary retro-reflection with mirror puck electrode still mounted to HVC.jpg current
- 16:05, 26 March 2024 diff hist 0 N File:Back end with laser beam through HVC.jpg current
- 16:04, 26 March 2024 diff hist 0 N File:S&A established laser launch along chamber z-axis 02.jpg current
- 16:03, 26 March 2024 diff hist 0 N File:R30-3 gun in LERF Lab 3A cleanroom 01.jpg current
- 16:01, 26 March 2024 diff hist -5 Mar 27 2024
- 16:01, 26 March 2024 diff hist +5 Mar 27 2024
- 16:01, 26 March 2024 diff hist -5 Mar 27 2024
- 16:00, 26 March 2024 diff hist -24 Mar 27 2024
- 15:58, 26 March 2024 diff hist +78 Mar 27 2024
- 15:57, 26 March 2024 diff hist +616 Mar 27 2024
- 15:52, 26 March 2024 diff hist +87 Mar 27 2024 →Updates
- 15:52, 26 March 2024 diff hist 0 N File:JL0163328, PUCK MANIPULATOR END ADAPTER TEFLON 24 in long.pdf current
- 15:51, 26 March 2024 diff hist +456 N Mar 27 2024 Created page with "==Updates== * Fabrication ** A new puck manipulator made out of Teflon and 24 inches long was designed and drawing submitted to the shop for fabrication. This manipulator wil..."
- 15:48, 26 March 2024 diff hist +69 200 kV Polarized Gun →R30-4 200 kV Gun SAD 2024 Planning Meetings
- 15:33, 26 March 2024 diff hist +7 Mar 20 2024 →Updates current
- 15:33, 26 March 2024 diff hist +10 Mar 20 2024 →Updates