GTS meeting 4 04 17
Jump to navigation
Jump to search
- Plans for this week:
- Beamline bake with full NEG activation – Done
- Degas Faraday Cup – Done
- Remove old laser – Done
- Put ND filters in front of YAG Screen cameras to prevent camera saturation – Done
- Calibrate laser power meter at exit window vs input window – Done
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size versus laser power
- Change laser size: x2 and x0.5
- Grow new photocathode with full active area – Delayed to next week, will run first with existing limited-active area photocathode