Past Week
- Bubble experiment
- Added new harp w/ temporary controls, HCO OK
- Restored radiator isolation w/ ceramic (shield aimed downstream), in series w/ FCUP, HCO OK
- Added Gumby (10 sec) laser shutter, tested w/ Beam OK, can now enable/disable from control room
- Restored x-ray card to set beam position at radiator
- Background looking OK ~0.01 Hz
- Upgrade Preparations
- Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
- DecaRad unit installed below outrigger laser table, heads/cables ready, ready soon