Research Notes and Documents

From Ciswikidb
Revision as of 14:18, 1 June 2018 by Yoskowij (talk | contribs)
Jump to navigation Jump to search

Tech Notes

  • WF Calibration -- 5/4/18 Calibration of the UITF Wien Filter (WF) by adjusting the E-Field and B-Field to determine the velocity of the electron beam
  • Spring 2018 QE vs. Charge & Fall 2016 QE vs. Charge -- 5/24/18 Plots of QE vs. Charge data from the CEBAF injector. The Spring 2018 plot corresponds to when the vertical WF was at 50 degrees and the horizontal WF was off. The Fall 2016 plot is the opposite with the horizontal WF at 50 degrees and the vertical WF was off.
  • Magnetic field in front of photogun idea -- 5/25/18 An idea that I had that may solve the problem of ion back-bombardment due to ion creation downstream of the anode.
  • Magnetic field in front of photogun idea -- 5/25/18 An idea that I had that may solve the problem of ion back-bombardment due to ion creation downstream of the anode.

Ion Bombardment of Solids Notes


Go to Logbook

Return to Home Page