GTS meeting 1 07 19

From Ciswikidb
Revision as of 09:57, 3 January 2019 by Suleiman (talk | contribs) (Created page with "*List of modifications: # Replace YAG screen on Viewer 1 # Replace Slit on Viewer 2 with holes assembly # Replace two ion collectors with new ones # Remove modified DP can # M...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • List of modifications:
  1. Replace YAG screen on Viewer 1
  2. Replace Slit on Viewer 2 with holes assembly
  3. Replace two ion collectors with new ones
  4. Remove modified DP can
  5. Move DP can 1 to end of beamline
  6. Remove Faraday Cup
  7. Remove bellow upstream of dump
  8. Replace Harp fork (Tony)
  9. Install TE011 Cavity
  10. Install Deflecting Cavity