GTS meeting 1 07 19

From Ciswikidb
Revision as of 10:02, 3 January 2019 by Suleiman (talk | contribs)
Jump to navigation Jump to search
  • List of modifications:
  1. Replace YAG screen on Viewer 1
  2. Replace Slit on Viewer 2 with holes assembly
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can
  6. Remove Faraday Cup
  7. Remove bellow upstream of dump
  8. Install TE011 Cavity
  9. Install Deflecting Cavity
  10. Install new 4th solenoid
  11. Move DP can 1 to end of beamline
  12. All bellows at least 2.5 inch diameter