GTS meeting 2 18 19
Jump to navigation
Jump to search
No Beam Tasks
- Re-install Viewer 3 camera
- Calibrate Viewers
- Install laser seed and pre-amp at 499.000 MHz
- Turn on QW Deflecting cavity
Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate
- Check magnets
- Check viewers
- Check QW Deflecting cavity
- Check