UITF to do list: March 11, 2019

• Brock bunch length monitor: o 1497 MHz trigger signal to fast scope o Connect oscope to network o Software o Video, tripod? • Dress ion pump cables, cut to length • Shelf for ion pump supply • Yao cavity installed, bake this region • Brock bunch length monitor at MeV dump • Yoa bunchlength electronics • Chopper and buncher epics screen calibrations • Characterize the buncher (Yan) • QE scan tool like one at CEBAF? To ground out the gun HV, or whatever it does • Test the Brock polarimeter • OSP for floating beam through the QCM, maybe just a revision of keV OSP? • Float beam through QCM, calibrate the BCM (beam small enough for this?) • UITF AOD o Channel access, implement it o MPS description o UED • Steering magnets on MeV beamline 1.5” pipe, or on 2.75” flanges? • Steering magnets for HDIce line, 3” pipe • Third magnet rack • Valve chassis for MeV beamline o Will our valve actuators always look kluged up? • Harps, install them, four more • MeV beamline BPMs, fix one of them (Phil is on it) • MeV viewers and video signals • Water flow through dumps and cups • Raster magnets and electronics, installed, functional • Water leak keV region • Update UED • Songsheet, as-built accurate drawing • Modify Eric’s quick view schematic (correct errors, if any) • Ask Eric for MeV quick view schematic • pA BPMs • Go-No Go detector for HDIce, near apertures, add these as fsd nodes • Summarize MPS/FSDs, install them, test them o Gun high voltage o Dipole magnet at 15 degree bend o Vertical chicane dipole (or is this PSS?) o Go-No Go sensor near HDIce, at one of the apertures o Vacuum interlock to valves o Vacuum interlock to chopper rf power, buncher power? o BLMs, need to put them on beamline o QCM liquid level o Water flow to buncher, chopper cavities • Modifications to PSS? o How does SSG want to interlock the vertical chicane dipole to PSS? o Third run/safe box • Electricians with some outlet strips along the beamline? That can be turned OFF with switch? • PSS BCM, needed or not? • North wall SEG blocks • Piers and chimney roof tile in place • 3rd review: who are reviewers, schedule it, agenda • Buy a vacuum cleaner for the cave and use it (Shark) • Clean up the caves • Labels applied to everything? • Replumb the GN2 manifolds