UITF to do list: March 11, 2019
- Brock bunch length monitor:
- 1497 MHz trigger signal to fast scope
- Connect oscope to network
- Software
- Video, tripod?
- Dress ion pump cables, cut to length
- Shelf for ion pump supply
- Yao cavity installed, bake this region
- Brock bunch length monitor at MeV dump
- Yao bunchlength electronics
- Chopper and buncher epics screen calibrations
- Characterize the buncher (Yan)
- QE scan tool like one at CEBAF? To ground out the gun HV, or whatever it does
- Test the Brock polarimeter
- OSP for floating beam through the QCM, maybe just a revision of keV OSP?
- Float beam through QCM, calibrate the BCM (beam small enough for this?)
- UITF AOD
- Channel access, implement it
- MPS description
- UED
- Steering magnets on MeV beamline 1.5” pipe, or on 2.75” flanges?
- Steering magnets for HDIce line, 3” pipe
- Third magnet rack
- Valve chassis for MeV beamline
- Will our valve actuators always look kluged up?
- Harps, install them, four more
- MeV beamline BPMs, fix one of them (Phil is on it)
- MeV viewers and video signals
- Water flow through dumps and cups
- Raster magnets and electronics, installed, functional
- Water leak keV region
- Update UED
- Songsheet, as-built accurate drawing
- Modify Eric’s quick view schematic (correct errors, if any)
- Ask Eric for MeV quick view schematic
- pA BPMs
- Go-No Go detector for HDIce, near apertures, add these as fsd nodes
- Summarize MPS/FSDs, install them, test them
- Gun high voltage
- Dipole magnet at 15 degree bend
- Vertical chicane dipole (or is this PSS?)
- Go-No Go sensor near HDIce, at one of the apertures
- Vacuum interlock to valves
- Vacuum interlock to chopper rf power, buncher power?
- BLMs, need to put them on beamline
- QCM liquid level
- Water flow to buncher, chopper cavities
• Modifications to PSS? o How does SSG want to interlock the vertical chicane dipole to PSS? o Third run/safe box • Electricians with some outlet strips along the beamline? That can be turned OFF with switch? • PSS BCM, needed or not? • North wall SEG blocks • Piers and chimney roof tile in place • 3rd review: who are reviewers, schedule it, agenda • Buy a vacuum cleaner for the cave and use it (Shark) • Clean up the caves • Labels applied to everything? • Replumb the GN2 manifolds