GTS meeting 3 25 19

From Ciswikidb
Revision as of 08:12, 24 March 2019 by Suleiman (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Laser 10 W Fiber Amp will be moved to Hall A Compton on April 8, 2019


  • List of things to do:
  1. Transverse beam emittance measurement with 1D pepper-pot
  2. Commission TE011 cavity
  3. Radiation Surveys at 1 mA
  4. Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm
  5. Ghost beam studies with P-Gun