April 25, 2019 - Weekly AIPINJ Meeting

From Ciswikidb
Revision as of 09:56, 24 April 2019 by Grames (talk | contribs) (Created page with "; Solenoid status * 38mm (2.99" OD) and 46mm (3.62" OD) options * preparing RFQ * support fixture * layout integration ; Wien filter status * CST running? * evaluation of cho...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Solenoid status
  • 38mm (2.99" OD) and 46mm (3.62" OD) options
  • preparing RFQ
  • support fixture
  • layout integration
Wien filter status
  • CST running?
  • evaluation of choke points
  • layout integration
Longitudinal diagnostics
  • 1497 MHz Yao cavity before booster for bunch compression
  • 1497 v. 499 MHz Harmonic resonant cavity before buncher media:190425_Brock.JPG
Beamline simulations