April 25, 2019 - Weekly AIPINJ Meeting
Jump to navigation
Jump to search
- Solenoid status
- 38mm (2.99" OD) and 46mm (3.62" OD) options
- preparing RFQ
- support fixture
- layout integration
- Wien filter status
- CST running?
- evaluation of choke points
- layout integration
- Longitudinal diagnostics
- 1497 MHz Yao cavity before booster for bunch compression
- 1497 v. 499 MHz Harmonic resonant cavity before buncher media:190425_Brock.JPG
- Beamline Updates
- as-found survey - http://devweb.acc.jlab.org/CSUEApps/atlis/task/19102
- simulations