GTS meeting 6 17 19
Jump to navigation
Jump to search
- NAPAC 2019 [1]:
- Abstract:
- ATLis Tasks:
- Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [2]
- Install New Spellman HV Supply at GTS (150 kV, 67 mA) [3]
- Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [4]
- TOSP:
- Operation of Thermionic Gun Hot Deck