- Overview:
- RF power to voltage relation- Complete
- See RF waveform "clipping"- complete (Need different optical link)
- DC bias fix- needs bench testing
- Quasi-bake of gun- complete
- OSP- 8/6-8/7
- HV processing- In progress
- HV processing with solenoid on- sometime in the future
- RF matching- sometime way in the future
- Talking points:
- HV Processing over the weekend [1]
- Krypton processing?
- Double click on the dial; not around it
- Optical-fiber link (need check voltage output of current unit and order)
- Run without RF to have something for NAPAC (doesn't require DC Bias fix)