GTS meeting 9 09 19

From Ciswikidb
Revision as of 07:30, 8 September 2019 by Suleiman (talk | contribs) (Created page with "*Update: ** Replaced thermionic cathode ** Added leak valve on mini-flange ** Started Kr processing *Talking Points: ** Equipment damage during HV processing: Radiation gam...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Update:
    • Replaced thermionic cathode
    • Added leak valve on mini-flange
    • Started Kr processing


  • Talking Points:
    • Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)