GTS meeting 9 16 19

From Ciswikidb
Revision as of 09:23, 16 September 2019 by Fhannon (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Update:
    • Glassman control chassis broken
    • Installed alternate Spellman supply (XRV225N3000: 225 kV, 30 mA, 3000 W unipolar mode supply)


  • To Be Fixed
    • LCW chassis
    • Glassman chassis


  • Suggested Actions:
    • Test gun with spellman for trips on PSS
    • Open up the gun - look for damage (take care with cathode)
    • Manufacture RF cage for gun. -> Have model from Xelera to begin this work.