(1) Get GTS back to operational
To Fix List (to get GTS running):
- Glassman PSS Chassis
- LCW Chassis
- Turbo
- Spellman
- Picoammeter x2?
To Check:
- Viewers
- Magnets
(2) T-Gun Upgrades
Need a safe gun - no devastating trips.
RF cage - Features:
- HV attaches through the back as designed.
- G10 plate to support the HV cable
- Nitrogen flow, also through G10 plate aimed at the back of the hot deck
- Nitrogen flow, though the top of the cage, aimed at ceramic
- Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown)
To Fix/Modify:
- DC bias supply - set point fix
- RF Cage
- Back plate to allow increased cooling (open the hole)
- Move Xelera spellman to the GTS vault
(3)
Housekeeping:
- Remove RXX cables from GTS
- Remove JLab spellman
- Sort out the air and nitrogen lines.
- Buy a shop vac