UITF Meeting - November 4, 2019

From Ciswikidb
Revision as of 08:46, 4 November 2019 by Poelker (talk | contribs)
Jump to navigation Jump to search
  • Fibers for helicity info to HDIce, 3 fibers, what are the fiber connectors?
  • Install the fiber modulator, 1 MHz signal generator, with BNC cable to the rack of lockin amplifiers
  • Build the apertures, with motorized bellows actuators like the chopper master slit, use Decarad to detect beam loss
  • Install Brock cavity
  • more pressure to spectrometer valve, it leaks
  • bake gun, high voltage condition, make a photocathode