media:HDIce to do list 1_3_2020.docx

Additional FSD nodes, some/all will be maskable • Ragowski coil low current BPM, trip beam when position and current exceeds a value determined by Kevin's Labview program • Halo counters at the dump • Halo counters at upstream apertures • Decarad? Will be installed but perhaps not used as FSD • the dump magnet must be ON • Superconducting IBC magnets must be ON, other protection required by ERR committee? • Raster magnets must be ON • some sort of vacuum guage at dump and near target, can be another ion pump current I guess


I&C stuff, Cable pulls:

• We need a frequency generator to drive the laser intensity modulator at 1 MHz • We need a copy of the 1 MHz signal delivered to the lockin amplifier rack • Aperture/stepper motor control (three of these, two near HDIce and one at Chopper) • Two viewers behind HDIce • New ADC card to read the SF6 pressure, per Scott Higgins’ request (the old XY566 ADC will be upgraded to a standard VMIc0979 board) • Remote control of the pockel cell voltages, DAC wired to the EMCO HV bricks (we won’t use the fancy RTP driver that Caryn Palatchi has you building, not at UITF) • Fibers (4?) from helicity board to the HDIce target • Ethernet cable from halo counters to….?

RF group:

• Buncher 748.5 MHz, and then 1497 MHz • Heaters added to buncher, cabled and fed to 120 VAC box, Hansknecht’s controller • Get 1497 MHz buncher made, fine tuned to be resonant • Buy 1497 MHz 400 W amp • Yao cavity bunch length electronics, software

Phil:

• Install 6” blank gasket with 5 mm hole for conductance limitation, in case we vent something, gives us time to close valves to protect the booster • Install manual valve on the elevated beamline, to make it easier to bake this line

Software related:

• Halo counters, need software, right? • Some way to export Labview info to read via epics • Raster magnets • Stepper motor control apertures and chopper slit • Pockel cell voltages via DAC

Computer control:

• Remote desktop to X computers inside Cave2 • Additional wall monitors?

RadCon: • Shielding concerns, high current at dumps, proximity of HDIce electronics