January 23, 2020 - Mechanical engineering

From Ciswikidb
Revision as of 12:39, 21 January 2020 by Grames (talk | contribs) (Created page with "From last week... ==ME updates== * Danny has updated layout w/ correct chopper beamline solenoids * Shaun has developed a design to fixture and align the beam line solenoids...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

From last week...

ME updates

  • Danny has updated layout w/ correct chopper beamline solenoids
  • Shaun has developed a design to fixture and align the beam line solenoids
  • Phil is tallying available BPM's types (tunnel + labs)
  • Marcy is checking on metallized YAG screen w/ hole
  • Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
  • Shaun/Joe are working to get laser room and outrigger table into CAD model