January 23, 2020 - Mechanical engineering

From Ciswikidb
Revision as of 20:07, 22 January 2020 by Grames (talk | contribs)
Jump to navigation Jump to search

From last week...

ME updates

  • Shaun has developed a design to fixture and align the beam line solenoids
=> updates?
  • Phil is tallying available BPM's types (tunnel + labs)
=> ?
  • Marcy is checking on metallized YAG screen w/ hole
=> ?
  • Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
=> Danny updated layout, will pass along to modelers
  • Shaun/Joe are working to get laser room and outrigger table into CAD model
=> In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox
=> Joe put photos on OneDrive, has dwg info for Shaun
  • Joe gave Chase info for magnet names
=> ...waiting
  • Modelers...
Reza and Alicia are on the hook to provide a sequence next tuesday's 1/28 meeting
Dennis is ready to put any layout into elegant to test optics, then we iterate
  • A1/A2
=> Reza is wondering about PSS kicker to A1, and A2 being remotely insertable (like A3 or A4)
  • Chopping chamber
=> fc#1 bellow is leaky, will need to replace this summer (if not sooner), so beam line will be vented...
  • Advanced Booster work
=> Neil is looking at plan to remove 5D beam line and construct support plates for 4500 lb QCM or Booster