Document-Controlled Procedures and Assessments for UITF
OSPs, TOSPs and LOSPs for UITF
these procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
Transferring (loading/removing) targets to/from the HDice IBC in cave-2 of the UITF, valid through 3/11/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94834
HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104
UITF Cave2 ceiling roof tile removal, valid through 7/2/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=87551
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380
UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility, valid through 2/20/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82655
UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424
keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/9/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82217
UITF TOSP_high voltage conditioning a new photogun with 225kV Spellman supply (not found in document control): File:UITF TOSP gun HV conditioning.pdf **** File:UITF THA gun HV conditioning.pdf
UITF Laser Systems LOSP, valid through 1/24/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=97400
Other official documents managed via document-control, e.g., official assessments
UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 File:UITF sweep procedure SSG-PR-03-101 Rev. 20.0 January 3, 2020.pdf
Shielding Design Package from Vashek, approved by SCMB: https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, Photos of trench foam and lead shielding media:UITF trench shielding with photos.xls
UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)
UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx
UITF Final Approved ODH Assessment: File:UITF ODH Assessment.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit
UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf