2021-01-26

From Ciswikidb
Revision as of 11:31, 26 January 2021 by Michaelm (talk | contribs) (Created page with "== Meeting Information == The meeting will be on Thursday January 14, 2020 at 2:00 PM EDT. ==== Connecting ==== To connect to the meeting, please do the following: # To join...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Meeting Information

The meeting will be on Thursday January 14, 2020 at 2:00 PM EDT.

Connecting

To connect to the meeting, please do the following:

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Rough timetable:

  1. Until CMTF testing: UITF will be locked up daily to improve the rf performance of the booster, measure optics, learn how to beta-match across the booster, etc. (Jan./Feb.)
  2. HDIce run2b (March 1-7)
  3. CMTF tests with C75-1 (mid-March - mid-April). Gigi: CMTF schedule / testing duration
  4. UITF beamline Modification in parallel to install new beamline
  5. First commissioning of water irradiation beamline in May??? (goal)

New items for discussion:

  • HDIce run2b discussion and impacts (Matt)
Tentative:
  • Rooftop removal Feb. 26/Install Mar. 1
  • Beam ~1 week
  • Engineering group changes and coordination / defer to HDIce
  • ERR Agenda & Assignments (Mike)
  • Solenoid Status & Installation (Gigi)


Reports on Open Action Items:

Back to Main Meeting Minutes Page