== Meeting Information ==The meeting will be on Thursday January 27, 2020 at 9:00 AM EST.

Connecting

To connect to the meeting, please do the following:

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Rough timetable:

  1. Until CMTF testing: UITF will be locked up daily to improve the rf performance of the booster, measure optics, learn how to beta-match across the booster, etc. (Jan./Feb.)
  2. ERR ~ Mid-Feb.
  3. HDIce run2b (March 1-7)
  4. CMTF tests with C75-1 (mid-March - mid-April). Gigi: CMTF schedule / testing duration
  5. UITF beamline Modification in parallel to install new beamline
  6. First commissioning of water irradiation beamline in May??? (goal)

New items for discussion:

  • HDIce run2b discussion and impacts (Matt)
Tentative:
  • Rooftop removal Feb. 26/Install Mar. 1
  • Beam ~1 week
  • Engineering group changes and coordination / defer to HDIce
  • ERR Agenda & Assignments (Mike)
  • Solenoid Status & Installation (Gigi)


Reports on Open Action Items: