HarmonicKicker-2021-09-17

From Ciswikidb
Revision as of 09:37, 17 September 2021 by Michaelm (talk | contribs) (Created page with "'''Agenda:''' *Discussion on the HAWG and the interface with JLAB control system *CW operation and possible pulsed operation: Tomasz and Brock *BPM capability to measure two b...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Agenda:

  • Discussion on the HAWG and the interface with JLAB control system
  • CW operation and possible pulsed operation: Tomasz and Brock
  • BPM capability to measure two beams "simultaneously: John Musson
  • Tuner control