Meeting 2/10/22 - COMTRA
Jump to navigation
Jump to search
First installation
- Radiator + ceramic in TL-1137, MIT polarized target + detector removed, survey then to TL https://logbooks.jlab.org/entry/3984465
- ME layout
DAQ system discussion
- Bryan/Chris
Geant4 model discussion
- Eric/Greg
Second installation
- Fabricate (2) 6mm Cu radiators
- Detector specs/status
- Magnet design/scope