Meeting 6/23/22 - COMTRA
Jump to navigation
Jump to search
6/23/22 Minutes
- ME - BNL/JLAB stand solution, Collimator
- Stand update ...
- Collimator ... we cannot find it, will need to make from existing stock, Greg will tell us the ID
- Magnet - Steel fab and first winding
- Detector - BGO shipment, box fab, PMT status
- BGO - DHL notice yesterday, should arrive in Richmond 6/28 from Germany
- Box in fabrication. It is likely that we will assemble them at IJCLab and send them mounted to JLab, This should save a bit of time.
- We also order the screw (~400 for the both boxes).
- The connectors (SHV and BNC) are already at Orsay and Thi is connecting them on the cables.
- Components for the PMT bases have been ordered.
- PMT delivery date is ...
- DAQ - ItoV decision
- ItoV quote - media:ItoV_quote.pdf
- What else?
- NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
- Manual - More of an operational document to augment NIM paper technical description